Instruction Manual
5 User Interface
transferring The job is currently being transferred.
transferred The job has been successfully transferred and is now
waiting for the start of the update procedure.
flashing The job is currently in the update phase.
flashed The update has been performed successfully on the
server.
rescanning The inventory of the server is being redetermined.
rebooting The server is currently rebooting.
done All components have been updated and the job is now
completed.
error Possible reasons:
l The update of at least one component failed.
l Check-Job was not successful
l Cleanup-Job was not successful
l Status could not be retrieved
manager abort The management station was restarted while the job
was being executed, see "Notes on management sta-
tions" on page 21.
Install Duration (Minutes)
Duration of the installation in minutes
Boot Time
Start time for the boot process (if Reboot = yes or Reboot = dynamic)
Download Size (MB)
Memory required for the update in megabytes
Released
This setting specifies whether the job is released (yes) or not released
(no) for execution on other PRIMERGY servers.
126 ServerView Update Management