System information

64 Upgrade and Maintenance Manual
RX2520 M1
Basic hardware procedures
4.7 Switching on the server
V CAUTION!
Before switching on the server, make sure the housing cover is
closed. In order to comply with applicable EMC regulations
(regulations on electromagnetic compatibility) and satisfy cooling
requirements, the PRIMERGY RX2520 M1 server must not run while
the housing cover is removed.
After connecting all power cords, wait at least 60 seconds before
pressing the On / Off button.
Follow the safety instructions in chapter "Important information" on
page 35.
Ê Press the On / Off button to start up the server.
Ê Perform the required procedures described in the concluding steps of each
upgrade or maintenance task.