System information

58 Upgrade and Maintenance Manual
RX2520 M1
Basic hardware procedures
Figure 8: Installing the air duct
Ê Insert the air duct first with the rear side (1).
Ê Fold down the air duct (2).
I If there is a FBU installed, follow the procedure that is described in
section "Installing the air duct with an FBU" on page 180.
4.5.2 Closing the server
V CAUTION!
Before attaching the covers, make sure no unnecessary parts or tools
are left inside the server.
In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
PRIMERGY RX2520 M1 server must not run while the housing cover
is removed.
For further safety information, please refer to chapter "Important
information" on page 35.