System information
232 Upgrade and Maintenance Manual
RX2520 M1
Accessible drives
12.2.4 Concluding steps
Ê "Installing the fan box" on page 146
Ê "Reassembling" on page 57
Ê "Connecting the server to the power source" on page 62
Ê "Enabling BitLocker functionality" on page 88
12.3 Removing a LSD module
12.3.1 Preliminary steps
Ê "Disabling BitLocker functionality" on page 65
Ê "Shutting down the server" on page 49
Ê "Disconnecting power cords" on page 50
Ê "Getting access to the component" on page 51
Ê "Removing the fan box" on page 144
Upgrade and Repair Unit
(URU)
Hardware: 10 minutes
Tools: tool-less