System information

RX2520 M1
Upgrade and Maintenance Manual 211
Processors
Figure 112: Closing the socket release lever
Ê Close the socket release lever (1) and latch it under the load plate retention
tab (2) to lock down the load plate.
Ê If applicable, install the second processor accordingly.
11.2.3 Concluding steps
Ê "Installing processor heat sinks" on page 219
Ê "Reassembling" on page 57
Ê "Connecting the server to the power source" on page 62
Ê "Updating or recovering the system board BIOS and iRMC" on page 73
Ê "Switching on the server" on page 64
Ê "Enabling SVOM boot watchdog functionality" on page 82
Ê "Enabling BitLocker functionality" on page 88