System information
RX2520 M1
Upgrade and Maintenance Manual 207
Processors
11.2 Installing processors
V CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.
11.2.1 Preliminary steps
Ê "Disabling BitLocker functionality" on page 65
Ê "Disabling SVOM boot watchdog functionality" on page 66
Ê "Shutting down the server" on page 49
Ê "Disconnecting power cords" on page 50
Ê "Getting access to the component" on page 51.c
11.2.2 Installing the processor
I This description applies to the following procedures:
– Installing the second CPU in a mono-processor configuration
– Transfering a CPU after replacing the system board (see section
"Swapping processors" on page 327)
Upgrade and Repair Unit
(URU)
Hardware: 15 minutes
Software: 5 minutes
Tool: Phillips PH2 / (+) No. 2 screw driver