Operation Manual
Table Of Contents
- Contents
- 1 Preface
- 2 Installation steps, overview
- 3 Important information
- 4 Hardware installation
- 5 Starting up and operation
- 5.1 Access to the drives (floorstand model)
- 5.2 Control elements and indicators
- 5.3 Switching the server on and off
- 5.4 Configuring the server
- 5.4.1 Configuring the onboard SATA controller
- 5.4.2 Configuring the SAS/SATA RAID controller
- 5.4.3 Configuring the server and installing the operating system with the ServerView Installation Manager
- 5.4.4 Configuring the server and installing the operating system without the ServerView Installation Manager
- 5.5 Cleaning the server
- 6 Property and data protection
- 7 Troubleshooting and tips
- 7.1 Power-on indicator remains unlit
- 7.2 Server switches itself off
- 7.3 Screen remains blank
- 7.4 Flickering stripes on monitor screen
- 7.5 No screen display or display drifts
- 7.6 No mouse pointer displayed on screen
- 7.7 Incorrect date and time
- 7.8 Drives reported as “dead” when starting system
- 7.9 Added drive reported as defective
- 7.10 Error message on screen
- 7.11 Expansion cards or onboard devices not recognized
- 7.12 Temperature warning
- 7.13 No effect of keyboard or mouse
- 7.14 Optical drive cannot read data
- 8 CSS components
- 8.1 Hot-plug components
- 8.2 Non-hot-plug components
- 9 Appendix: server specification
- Index

58 Operating Manual TX150 S7
Notes on connecting/disconnecting cables Hardware installation
4.6 Notes on connecting/disconnecting cables
V CAUTION!
Always read the documentation supplied with the device you wish to
connect.
Never connect, or disconnect cables during a thunderstorm.
Never pull on a cable when disconnecting it. Always take hold of the
cable by the plug.
Follow the sequence described below to connect or disconnect external
devices to or from the server:
Be sure to wait for 10 seconds or more after shutdown before turning the
server on.
Connecting cables
Ê Turn off all power and equipment switches.
Ê Disconnect all power plugs from the properly grounded power outlets.
Ê Connect all cables to the server and peripherals.
Ê Plug all data communication cables into the utility sockets.
Ê Plug all power cables into the properly grounded power outlets.
Disconnecting cables
Ê Turn off all power and equipment switches.
Ê Disconnect all power plugs from the properly grounded power outlets.
Ê Unplug all data communication cables from the utility sockets.
Ê Disconnect the relevant cables from the server and all the peripherals.