Server User Manual
Note -
Inactive/cold maintenance can be performed only for a building block configuration.
The inactive/cold maintenance procedure for a single-chassis configuration is the same as
that for stopping the system.
For details, see "6.1 Incorporating an FRU into the System with the replacefru
Command."
3.
Incorporate the chassis, in which the power supply unit requiring maintenance
is mounted, into the physical partition.
For details, see "6.2 Incorporating a Chassis into a Physical Partition."
4.
Close the rack door.
10.6.3 Inactive/Hot maintenance
For a single-chassis configuration
1.
Log in to the XSCF shell.
2.
Return to the operation of the XSCF firmware replacefru command to confirm
that the power supply unit has been incorporated into the system.
For details, see "6.1 Incorporating an FRU into the System with the replacefru
Command."
3.
Start the entire system.
For details, see "6.4 Starting the Entire System."
4.
Close the rack door.
For a building-block configuration
1.
Log in to the XSCF shell.
2.
Return to the operation of the XSCF firmware replacefru command to confirm
that the power supply unit has been incorporated into the system.
For details, see "6.1 Incorporating an FRU into the System with the replacefru
Command."
3.
Pow er on the physical partition requiring maintenance.
For details, see "6.3 Powering On the Physical Partition Requiring Maintenance."
4.
Close the rack door.
10.6.4 Inactive/Cold maintenance
1.
Connect all the power cords to the PSU backplane unit of the chassis
requiring maintenance.
For details, see "6.5.1 Installing the power cord."
Fujitsu M10-4/Fujitsu M10-4S/SPARC M 10-4/SPARC M10-4S Service Manual
・
December 2013202