Server User Manual

Note -
Check that the cable support is firmly attached and fixed.
Figure 6-5
Locking the cable support
2.
Tighten the right and left screws to fix the cable support.
6.5.3 Installing the front cover
If the front cover of the SPARC M10-4S or the crossbar box was removed to perform
maintenance, install it after installing the components at the front of or inside the
chassis.
1.
To install the front cover, insert the tabs of the front cover into the notches at
Chapter 6 Understanding the Prepara tions for Restoring the System 79