User Manual - English PRIMECENTER M1 19-inch Rack Rack System for PRIMERGY, PRIMEQUEST, BS2000, STORAGE February 2012
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.vor © cognitas. Gesellschft für Technik-Dokumentation mbH 2012 Comments… Suggestions… Corrections… The User Documentation Department would like to know your opinion of this manual. Your feedback helps us optimize our documentation to suit your individual needs. Feel free to send us your comments by e-mail to email: manuals@ts.fujitsu.com.
Before reading this manual For your safety This manual contains important information for safely and correctly using this product. Carefully read the manual before using this product. Pay particular attention to the accompanying manual "Safety notes and other important information" and ensure these safety notes are understood before using the product. Keep this manual and the manual "Safety notes and other important information" in a safe place for easy reference while using this product.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.vor © cognitas. Gesellschft für Technik-Dokumentation mbH 2012 Technology controlled by the Foreign Exchange and Foreign Trade Control Law of Japan Documents produced by FUJITSU may contain technology controlled by the Foreign Exchange and Foreign Trade Control Law of Japan.
Contents 1 Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 1.1 Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 1.2 Target Group . . . . . . . . . . . . . . . . . . . . . . . . . . 13 1.3 Where to find which information . . . . . . . . . . . . . . . 13 1.4 Structure of the manual . . . . . . . . . . . . . . . . . . . . 14 1.5 Notational Conventions . . . . . . . . . . . . . . . . . . . . 15 2 Important Information . . . . . . . . . . . . . . . . . . .
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.ivz © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Contents 5.1 Support Systems . . . . . . . . . . . . . . . . . . . . . . . . 38 5.2 5.2.1 Mounting in the front 19-inch area . . . . . . . . . . . . . . . 38 Mounting support brackets . . . . . . . . . . . . . . . . . . . . 39 5.3 Mounting in the rear 19-inch area . . . . . . . . . . . . . . . 41 5.4 5.4.
Contents 7.3.7 7.3.8 Socket strip extension 3 safety plugs and assembly . . . . . . . 98 Single-phase 4+1-way socket strip and assembly . . . . . . . . 102 7.4 Connecting to the potential compensating system . . . . . 105 7.5 Power Supply via UPS . . . . . . . . . . . . . . . . . . . . . 106 8 Optional accessories . . . . . . . . . . . . . . . . . . . . . . 107 9 Appendix . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109 9.1 Door conversion . . . . . . . . . . . . . . . . . . . . . . .
© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
1 Preface The data centers of today and tomorrow have to meet the continuously increasing requirements and demands of operators. Fujitsu has been offering well thought-out and permanently evolved rack systems for decades now. This in-depth experience with the development and operation of data centers and the associated close contact with operators is also reflected in the latest PRIMECENTER M1 19-inch rack family.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k01 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Preface the flexibility you need to cover your current requirements. Consequently, PRIMECENTER M1 racks can also be integrated in future concepts and thus offer long-term investment protection.
Preface The optimized cable management patented by Fujitsu Technology Solutions is a major highlight in the asymmetrical PRIMECENTER M1 rack system. The asymmetrical rack structure with a section for side cable routing reduces the impairment to the air flow behind the rack devices.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k01 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Preface Asymmetrical racks prepared for the patented lateral cable management. Cabling openings in the roof of the rack, in the floor group and in the rear door. Service: Doors can be optionally mounted to the left or right, and can be unhinged easily by a single person. Split rear doors to reduce the required service space.
Preface 1.2 Target Group This manual is intended for those responsible for installing and maintaining the PRIMECENTER M1 19-inch rack (service personnel, technicians and technical specialists). The manual is organized in a way that you can commission the rack without prior special knowledge. Knowledge of the hardware to be integrated is helpful for understanding the various connection options.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k01 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Preface Document Description Quick Start Guides In these guides you will find precautions and information about unpacking, checking and installing the rack and its components.
Preface 1.
© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
2 Important Information 2.1 Safety Instructions I The following safety instructions are also provided in the manual "Safety Notes and Regulations". V CAUTION! Observe the safety instructions in the documentation for the individual components mounted in the rack and the following notes on safety. ● The activities described in this manual may only be performed by technical specialists.
V CAUTION! ● The maximum transport weight may not exceed a specific maximum (see table "Summary of all rack types" on page 26). ● For safety reasons, no more than one unit must be pulled out of the rack at a time, otherwise the rack may tip over. This is illustrated by the following pictograms: © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
Important Information V CAUTION! The AC main power connection for the PRIMECENTER M1 19-inch rack must be installed by an authorized electrician approved by the local utility company. 2.2 Notes on mounting the rack components Before you start mounting components in the rack, please identify the positions of the individual components in the PRIMECENTER M1 19-inch rack according to the configuration generated using the "SystemArchitect" (see page 35).
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k02 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Important Information 2.3 Environmental Protection Environmentally Friendly Product Design and Development This product has been designed in accordance with the Fujitsu standard for "environmentally friendly product design and development".
Important Information Fujitsu Technology Solutions GmbH Recycling Center D-33106 Paderborn Tel.
© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
3 Overview The PRIMECENTER M1 19-inch Rack is a universal rack system for the creation of integrated data center infrastructure solutions from server, storage, network, management and UPS components. In addition to Fujitsu servers, storage subsystems, UPSs, modems, etc. are also available for installation.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k03 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Overview Rack system with horizontal ventilation The PRIMECENTER M1 rack is ventilated from the front to the rear. A fully configured rack in normal air-conditioned rooms can be operated at temperatures up to 35°C. The volume of air required to cool the rack modules is supplied via the integral horizontal ventilation system.
Overview installed components upon removal of the upper/side covers. Optimized cable management solutions for the various rack types also play their part in this by allowing reliable and orderly routing of cables. Hot-plug hard disks and hot-plug power supply modules can be exchanged online even more easily. The rack doors can be easily unhinged and replaced again by a single person without any tools.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k03 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Overview Security The rack is suitable for installation and operation of rack management systems. If rack devices with telescopic rails are used, it is necessary for security reasons to ensure that racks are protected against tilting by means of suitable anti-tilt protection.
4 Preparations This chapter describes the preparations for installation and all the tasks involved in setting up and operating the PRIMECENTER M1 19-inch rack.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k04 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Preparations Figure 3: Service areas for 600 mm racks The figures above show the specific service areas for 700 mm (see figure 2 on page 27) and 600 mm (see figure 3) racks.
Unpacking and checking the delivery unit 4.1 Unpacking the delivery unit I For a description to unpack the PRIMECENTER M1 19-inch rack please refer to the info-sheet delivered with the rack. 4.2 Rolling off the PRIMECENTER M1 19-inch rack from the transport palette I For a description to roll off the rack from the transport palette please refer to the info-sheet delivered with the rack. 4.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k04 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Setting up the PRIMECENTER Rack Performing the task Figure 4: Screwing down the leveling feet Ê Screw down the four leveling feet using a 6 mm hexagon key. I The leveling feet are easier to adjust if not carrying the full weight of the rack.
Setting up the PRIMECENTER Rack Figure 5: Adjusting the PRIMECENTER M1 19-inch rack Ê Adjust the rack on all three axes (X,Y,Z) with the leveling feet. Use a spirit level to make sure the rack is exactly level! I The horizontal orientation of the rack is required to ensure the pull-out functions of the components mounted to the rack. The rack is set up properly, as a rule, when the front panels of the mounted components add up to form a continuous vertical line! 4.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k04 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Setting up the PRIMECENTER Rack 4.5 Opening the rack door The door of the rack has to be opened carefully as described below: 0 / Figure 6: Opening the rack door 1. Turn the key clockwise as far as it will go (1). 2. Grasp the green marked grip and swivel it in the direction of the arrow (2).
Inserting mounting elements 4.6 Inserting mounting elements 4.6.1 Inserting Cage Nuts Introduction Cage nuts are placed into the support uprights. A special tool helps you to mount it (see figure 7). Performing the task Figure 7: Inserting cage nuts Ê Insert the cage nut as shown in the figure with the bottom part of the cage in the appropriate mounting hole of the support upright (1). Ê Use the tool supplied to lever the upper part of the cage nut into the mounting hole as shown (2).
4.6.2 Inserting Spring Nuts Introduction You need spring nuts for mounting socket strips for the power supply of the rack components. Performing the task Ê Mark the position of the components to be fitted on the four support uprights. I In order to facilitate the positioning, assembly aids are shipped with the rack components. © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
5 Preparing to install rack components This chapter describes how to prepare the PRIMECENTER M1 19-inch rack to install rack components. Refer to the appropriate delivery documentation (i.e. Quick Start Guide) for information on how to mount the components themselves. The rack has three areas in which components can be mounted: – the 19-inch area with 16/24/42 HU, which is accessible from the front and is used for mounting the rack components horizontally.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k05 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Preparing to install rack components Figure 9: Screen of the SystemArchitect I More information can be found at the following web site: http://configurator.ts.fujitsu.com/public/public_en.
Preparing to install rack components The Height Unit (HU) The unit of measurement used in the PRIMECENTER M1 19-inch rack is the height unit (HU). One height unit comprises a 3-hole section in the front area and mounting area (starts and ends with a narrow metal bar) and corresponds to 44.45 mm or 1 ¾ inches. The height units are numbered consecutively in ascending order from 1 upwards on each vertical support upright.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k05 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Support systems 5.1 Support Systems Support systems are needed in order to be able to integrate system components effortlessly into the rack.
Mounting in the front 19-inch area 5.2.1 Mounting support brackets I Support brackets are required only for asymmetrical PRIMECENTER M1 19-inch racks. A support bracket is required for mounting components regardless of whether telescopic rails or sliding rails are used. Figure 11: Support brackets for 1 HU (left), 2 HU (middle) and 3 HU (right) Support brackets with a load capacity of 15 kg (1 HU), of 35 kg (2 HU), of 50 kg (3 HU) and of 200 kg (10 HU) are available.
Performing the task 2x © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k05 Mounting in the front 19-inch area Figure 12: Sample of mounting a 2 HU support bracket Ê Mount the support bracket as shown and screw it to the rear left support upright at the appropriate height using the delivered screws.
Mounting in the rear 19-inch area 5.3 Mounting in the rear 19-inch area You can mount additional rack components in the rear 19-inch area if: – the front area is not occupied with rack components – the rack components mounted in the front area leave enough space for additional components to be mounted at the rear (in the rear area) – the rack components in the rear do not hinder the cooling air stream for the components in the front area.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k05 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Mounting in the expansion area 5.4 Mounting in the expansion area 19-inch rack components can be mounted vertically in the optional expansion area to the left of the 19-inch area. I The expansion area is only available in 700 mm racks.
Mounting in the expansion area 5.4.1 Mounting Rack Components Figure 14: Mounting a rack component in the expansion area Ê Remove the cover (3) from the appropriate slot. Ê Insert the cage nuts as required for the component to be installed (1). Ê Install the rack component (2) and cover any resulting gap with an appropriate cover.
5.5 Rack cable routing with external cabling 5.5.1 Cable routing in the lower area Cables can be routed in the lower area: ● within asymmetrical racks: only on the left (frontside view) ● within symmetrical 700 mm racks: on the right and on the left (frontside view) as well as in the back of the 19-inch server area. Cable routing through the false floor © cognitas.
Cable Inlets and Outlets The following figure shows the cable cut-outs in the bottom area in 600 mm racks: 118(71) Reserved for tilt-protection 105 118(71) 98 Cut-outs for cable routing in the botton area in 600mm Racks only 71x105 Figure 16: Cable cut-outs for cable routing in the bottom area 45
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k05 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Cable Inlets and Outlets Cable cut-out at the lower rear door A cable cut-out ( so-called "cat door") can be found at the lower end of the right rear door (see following figure).
Cable Inlets and Outlets Figure 18: Cable cut-out with edge protectors Ê Mount the edge protectors to the cut-out (see following figure). I Make sure that both edge protectors are flush with the door edge.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k05 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Cable Inlets and Outlets Option: Brush for the cat door A plastic brush can be mounted optionally to the opening (see following figure). Figure 19: Fastening point for the brush Ê Screw the brush with one screw onto the rear door. I Take care, that the brush is installed horizontal and fasten the screw with a torque value of 2.5 Nm.
Cable Inlets and Outlets 5.5.2 Cable routing through the top cover The 42 HU racks offer the possibility to route cables through the top cover by means of the brush panel kit. Two special cut-outs have been foreseen which can be opened by cutting through the micro-joints of the cover sheet. I Cable routing via the cut-out without the brush panel kit is not allowed, because cables may be damaged by sharp edges.
© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k05 Cable Inlets and Outlets Figure 22: Cutting through the micro-joints Ê Cut through the micro-joints of the top cover cable cut-out.
Cable Inlets and Outlets Figure 23: Mounting the edge protector Ê Mount the edge protector around the top cover cut-out to prevend cable damaging by sharp edges (see arrows). / 0 Figure 24: Cable cut-out on top with brush panel kit Ê Mount the two brushes at both sides of the top cover cut-out.
© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
6 Cable Management The cable management comprises the following parts: – lateral cable management (only for asymmetrical 700 mm PRIMECENTER M1 19-inch racks) – cable guides with cable clips – cable management arms (see description provided) 6.1 Mounting components of the cable management 6.1.1 Lateral cable management I The lateral cable management can only be used in asymmetrical 700 mm PRIMECENTER M1 19-inch racks.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k06 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Mounting the Cable Management Performing the task 1 2 Figure 25: Mounting a lateral cable management for 19-inch DC-PC-racks Ê Insert the lateral cable management into the openings in the special upright (see circle) at the appropriate height as shown.
Mounting the Cable Management 6.1.2 Cable guide with cable clips I The cable guide with cable clips can only be used in asymmetrical 700 mm PRIMECENTER M1 19-inch racks. Introduction You can use one or more cable guides with cable clips to store excess lengths of cable in an orderly fashion at appropriate locations in the rack. The other cable clips supplied can be distributed over the rack and mounted on the support brackets as needed.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k06 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Connecting and Disconnecting Cables 6.2 Connecting and disconnecting cables Introduction The following advices have to be observed when connecting cables to the rack. V CAUTION! 6.2.1 ● The power plug(s) must be pulled out! ● Read the documentation for the device before you connect it.
Connecting and Disconnecting Cables Make sure that the cabling of devices with a "dual power feed" fulfils the conditions of the high availability requirements of the system. 6.2.2 Disconnecting Cables Performing the task Ê Switch off all affected devices. Ê Pull the power plugs of all affected devices out of the sockets on the socket strip in the PRIMECENTER M1 19-inch rack. Ê Pull all data transmission cables out of the sockets provided for the data transmission or telephone networks.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k06 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Connecting and Disconnecting Cables 6.3 Routing Cables This section contains several examples of how to route cables in the PRIMECENTER M1 19-inch rack. Introduction Only internal cables are routed at the factory before delivery. All other cables must be routed during rack installation at customer site.
Connecting and Disconnecting Cables 6.3.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k06 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Connecting and Disconnecting Cables 6.3.2 Routing cables using a lateral cable management Performing the task Figure 29: Routing cables using a lateral cable management for 19-inch DC-PC-racks Ê Route the cables as shown in the figure above.
Connecting and Disconnecting Cables 6.3.3 Cable routing and strain relief for the built-in rack components in asymmetrical racks The rack component is inserted in the PRIMECENTER M1 19-inch rack and secured. The cables are attached to the relevant plug connectors and should be routed in the lateral cable management system with a reserve length by making a loop over the center axis of the rack component (see figure 30).
connectors lateral cable management loom of cables Figure 31: Rack top view: rack component pulled out half way 62 front of the Rack When the rack components are extracted, the cables fixed in the lateral cable management are also pulled out. The lateral cable management stabilizes the cables at the appropriate rack component height and thus ensure a trouble-free insertion and removal (see figure 31 below and figure 32 on page 63).
loom of cables lateral cable management connectors front of the Rack 105 % Connecting and Disconnecting Cables Figure 32: Rack top view: rack component pulled out fully 63
6.3.4 Cable Guide with Cable Clips The example below shows you how to route excess lengths of cable in the PRIMECENTER M1 19-inch rack using a cable guide with cable clips. V Caution! In the case of fiber-optic cables, a minimum bending radius must be adhered to. I The cable guide with cable clips can only be used in asymmetrical 700 mm PRIMECENTER M1 19-inch racks. © cognitas.
Connecting and Disconnecting Cables 6.3.5 Direct Connection The example below shows how to connect cables directly to a rack component installed on sliding rails. Figure 34: Routing cables of a rack component with direct connection Ê Route the cables in the side area of the rack as shown in the figure above. V CAUTION! The ventilation slots of the devices installed underneath must not be covered by the cables.
© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
7 Power Distribution The PRIMECENTER M1 19-inch rack offers various possibilities for distributing power to the integrated rack components. Therefore only a few selected proposals are described here. For more information, please refer to the web: http://manuals.ts.fujitsu.com/index.php?id=5406-5605-5606 The following socket strips are currently available: Total no.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k07 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Power Distribution Redundancy concept The power supply to the PRIMECENTER M1 19-inch rack can be included optionally as part of a redundancy concept. In the simplest scenario, redundancy is achieved with the 3-phase mains connection by distributing redundant power supplies to the phases.
Power Distribution 7.1 Installing PDU brackets Introduction All PDUs have to be mounted using versatile mounting brackets (PDU brackets). These PDU brackets (see following figure) can be mounted in various heights on both sides of the rack’s rear side.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k07 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Power Distribution Performing the task Figure 36: Two installed spring nuts Ê Install the spring nuts M5 into the groove of the rear pillars (see circles) as described in section "Inserting Spring Nuts" on page 34.
Power Distribution 7.2 Mounting socket strips onto PDU kit 3HU I Horizontal mounting is the only way to mount socket strips into a 600 mm rack.
Performing the task Figure 39: Mounting socket strips onto the PDU kit 3HU Ê First of all screw the desired socket strip(s) onto each holder extension lead of the PDU kit 3HU as shown in figure above (see circles). © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
Power Distribution 7.3 Installing the socket strips 7.3.1 32 A single-phase 5-way socket strip Introduction No. of sockets 10 A No. of sockets 16 A Type of plug Max. current 2x IEC 60320 C13 3x IEC 60320 C19 blue 32 A IEC 60309 (1-phase) 32 A I For more information, see the configurator: https://partners.ts.fujitsu.com/com/ordersupply/configurators/primergy_config/Pages/Currentconfigurators.
7.3.1.1 Installation options for 700 mm wide asymmetrical racks Rack height 42 HU 24 HU Installation direction vertically conditionally possible1 conditionally possible 1 Installation direction horizontally Max. 4x with PDU kit 3 HU Max. 4x with PDU kit 3 HU Table 2: Installation options for 700 mm wide asymmetrical racks 1 Installation only possible on the left rear side (front side view). Cable routing is restricted.
Power Distribution 7.3.1.2 Installation options for 700 mm wide symmetrical racks Rack height 42 HU 24 HU Installation direction vertically conditionally possible1 conditionally possible 1 Installation direction horizontally Max. 4x with PDU kit 3 HU Max. 4x with PDU kit 3 HU Table 3: Installation options for 700 mm wide symmetrical racks 1 Installation is only possible on the rear side. Cable routing is restricted. Installation of cable arms at the same height is not possible.
7.3.1.3 Installation options for 600 mm wide symmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU Not possible Max. 4x with PDU kit 3 HU 24 HU Not possible Max. 4x with PDU kit 3 HU 16 HU Not possible Max. 4x with PDU kit 3 HU Table 4: Installation options for 600 mm wide symmetrical racks Performing the task Ê Install the socket strips onto the PDU kit 3 HU as described on page 71. © cognitas.
Power Distribution 7.3.2 Single-phase 10-way socket strip w/o plug Introduction No. of sockets 10 A No. of sockets 16 A Type of plug Max. current 4x IEC 60320 C13 6x IEC 60320 C19 none 50 A I For more information, see the configurator: https://partners.ts.fujitsu.com/com/ordersupply/configurators/primergy_config/Pages/Currentconfigurators.
7.3.2.1 Installation options for 700 mm wide asymmetrical racks Rack height 42 HU 24 HU Installation direction vertically conditionally possible1 conditionally possible 1 Installation direction horizontally Max. 2x with PDU kit 3 HU Max. 2x with PDU kit 3 HU Table 5: Installation options for asymmetrical racks 1 Installation only possible on the left rear side (front side view). Cable routing is restricted. Performing the task Ê Install the PDU brackets as described on page 69. © cognitas.
Power Distribution 7.3.2.2 Installation options for 700 mm wide symmetrical racks Rack height 42 HU 24 HU Installation direction vertically conditionally possible1 conditionally possible 1 Installation direction horizontally Max. 2x with PDU kit 3 HU Max. 2x with PDU kit 3 HU Table 6: Installation options for asymmetrical racks 1 Installation is only possible on the rear side. Cable routing is restricted. Installation of cable arms at the same height is not possible.
7.3.2.3 Installation options for 600 mm wide symmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU Not possible Max. 2x with PDU kit 3 HU 24 HU Not possible Max. 2x with PDU kit 3 HU 16 HU Not possible Max. 2x with PDU kit 3 HU Table 7: Installation options for 600 mm wide symmetrical racks Performing the task Ê Install the socket strip onto the PDU kit 3 HU as described on page 71. © cognitas.
Power Distribution 7.3.3 32 A three-phase 15-way socket strip Introduction No. of sockets 10 A No. of sockets 16 A Type of plug Max. current 6x IEC 60320 C13 9x IEC 60320 C19 red 32 A IEC 60309 (3-phase) 3x 32 A I For more information, see the configurator: https://partners.ts.fujitsu.com/com/ordersupply/configurators/primergy_config/Pages/Currentconfigurators.
7.3.3.1 Installation options for 700 mm wide asymmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU conditionally possible1 Max. 2x with PDU kit 3 HU 24 HU conditionally possible1 Max. 2x with PDU kit 3 HU Table 8: Installation options for asymmetrical racks 1 Installation only possible on the left rear side (front side view). Cable routing is restricted. Performing the task Ê Install two PDU brackets as described on page 69. © cognitas.
Power Distribution 7.3.3.2 Installation options for 700 mm wide symmetrical racks Rack height 42 HU 24 HU Installation direction vertically conditionally possible1 conditionally possible 1 Installation direction horizontally Max. 2x with PDU kit 3 HU Max. 2x with PDU kit 3 HU Table 9: Installation options for asymmetrical racks 1 Installation is only possible on the rear side. Cable routing is restricted. Installation of cable arms at the same height is not possible.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k07 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Power Distribution Ê Install the socket strip with 2 screws onto the PDU brackets. I Installation is possible on both sides. 7.3.3.3 Installation options for 600 mm wide symmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU Not possible Max.
Power Distribution 7.3.4 Three-phase 24-way socket strip Introduction No. of sockets 10 A No. of sockets 16 A Type of plug Max. current 24x IEC 60320 C13 none red 16 A IEC 60309 (3-phase) 3x16 A I For more information, see the configurator: https://partners.ts.fujitsu.com/com/ordersupply/configurators/primergy_config/Pages/Currentconfigurators.
7.3.4.1 Installation options for 700 mm wide asymmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU 2x Not possible 24 HU 1x Not possible Table 11: Installation options for 700 mm wide asymmetrical racks Performing the task Ê Install two PDU brackets as described on page 69. © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
Power Distribution 7.3.4.2 Installation options for 700 mm wide symmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU 2x Not possible 24 HU 1x Not possible Table 12: Installation options for 700 mm wide asymmetrical racks Performing the task Ê Install two PDU brackets as described on page 69.
Ê Screw the socket strip with 2 screws each onto the PDU brackets. I Installation is possible on both sides. 7.3.4.3 Installation options for 600 mm wide symmetrical racks I The installation of this socket strip is not possible within this type of rack. © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
Power Distribution 7.3.5 Single-phase 8-way socket strip and assembly Introduction No. of sockets 10 A No. of sockets 16 A Type of plug Max. current 8x IEC 60320 C13 none blue 32 A IEC 60309 32 A I For more information, see the configurator: https://partners.ts.fujitsu.com/com/ordersupply/configurators/primergy_config/Pages/Currentconfigurators.
7.3.5.1 Installation options for 700 mm wide asymmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU ok Max. 4x with PDU kit 3 HU 24 HU ok Max. 4x with PDU kit 3 HU Table 13: Installation options for 700 mm wide asymmetrical racks Performing the task Ê Install two PDU brackets as described on page 69. © cognitas.
Power Distribution 7.3.5.2 Installation options for 700 mm wide symmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU ok Max. 4x with PDU kit 3 HU 24 HU ok Max. 4x with PDU kit 3 HU Table 14: Installation options for 700 mm wide asymmetrical racks Performing the task Ê Install two PDU brackets as described on page 69.
7.3.5.3 Installation options for 600 mm wide symmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU Not possible Max. 4x with PDU kit 3 HU 24 HU Not possible Max. 4x with PDU kit 3 HU 16 HU Not possible Max. 4x with PDU kit 3 HU Table 15: Installation options for 600 mm wide symmetrical racks Performing the task Ê Install the socket strips onto the PDU kit 3 HU as described on page 71. © cognitas.
Power Distribution 7.3.6 Single-phase 10-way socket strip and assembly Introduction No. of sockets 10 A No. of sockets 16 A Type of plug Max. current 10x IEC 60320 C13 none blue 16 A IEC 60309 16 A 10x IEC 60320 C13 none 16 A NEMA L 6-30 16 A 10x IEC 60320 C13 none 16 A IEC 60320 C20 for 16 A UPS units I For more information, see the configurator: https://partners.ts.fujitsu.com/com/ordersupply/configurators/primergy_config/Pages/Currentconfigurators.
© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
Power Distribution 7.3.6.1 Installation options for 700 mm wide asymmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU ok ok 24 HU ok ok Table 16: Installation options for 700 mm wide asymmetrical racks Performing the task Ê Install the PDU brackets as described on page 69. Figure 63: Single-phase 10-way socket strip mounted in a 700 mm wide asymmetrical rack Ê Screw each socket strip with 2 screws onto the PDU brackets.
7.3.6.2 Installation options for 700 mm wide symmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU 2x ok 24 HU ok ok Table 17: Installation options for 700 mm wide symmetrical racks Performing the task Ê Install the PDU brackets as described on page 69. © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
Power Distribution 7.3.6.3 Installation options for 600 mm wide symmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU Not possible Max. 4x with PDU kit 3 HU 24 HU Not possible Max. 4x with PDU kit 3 HU 16 HU Not possible Max. 4x with PDU kit 3 HU Table 18: Installation options for 600 mm wide symmetrical racks Performing the task Ê Install the socket strips onto the PDU kit 3 HU as described on page 71.
7.3.7 Socket strip extension 3 safety plugs and assembly Introduction No. of C13-type sockets No. of safety sockets Type of plug Max. current None 3 Safety socket (C13) 10 A I For more information, see the configurator: https://partners.ts.fujitsu.com/com/ordersupply/configurators/primergy_config/Pages/Currentconfigurators.aspx © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
Power Distribution 7.3.7.1 Installation options for 700 mm wide asymmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU ok Max. 4x with PDU kit 3 HU 24 HU ok Max. 4x with PDU kit 3 HU Table 19: Installation options for 700 mm wide asymmetrical racks Performing the task Ê Install the PDU brackets as described on page 69.
7.3.7.2 Installation options for 700 mm wide symmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU ok Max. 4x with PDU kit 3 HU 24 HU ok Max. 4x with PDU kit 3 HU Table 20: Installation options for 700 mm wide symmetrical racks Performing the task Ê Install the PDU brackets as described on page 69. © cognitas.
Power Distribution 7.3.7.3 Installation options for 600 mm wide symmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU Not possible Max. 4x with PDU kit 3 HU 24 HU Not possible Max. 4x with PDU kit 3 HU 16 HU Not possible Max. 4x with PDU kit 3 HU Table 21: Installation options for 600 mm wide symmetrical racks Performing the task Ê Install the socket strips onto the PDU kit 3 HU as described on page 71.
7.3.8 Single-phase 4+1-way socket strip and assembly Introduction No. of C13-type sockets No. of safety sockets Type of plug Max. current 4x 1x safety plug 10 A I For more information, see the configurator: https://partners.ts.fujitsu.com/com/ordersupply/configurators/primergy_config/Pages/Currentconfigurators.aspx © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
Power Distribution 7.3.8.1 Installation options for 700 mm wide asymmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU ok Not mountable with PDU kit 3 HU 24 HU ok Not mountable with PDU kit 3 HU Table 22: Installation options for 700 mm wide asymmetrical racks Performing the task Ê Install the PDU brackets as described on page 69.
7.3.8.2 Installation options for 700 mm wide symmetrical racks Rack height Installation direction vertically Installation direction horizontally 42 HU ok Not mountable with PDU kit 3 HU 24 HU ok Not mountable with PDU kit 3 HU Table 23: Installation options for 700 mm wide symmetrical racks Performing the task Ê Install the PDU brackets as described on page 69. © cognitas.
Power Distribution 7.4 Connecting to the potential compensating system If required by local regulations, the PRIMECENTER M1 19-inch rack can be connected to the indoor potential-compensating system via the grounding screw located at the lower left side of the rack chassis (see photo below). This grounding only protects from external parasitic voltages and does not replace the protective conductor in the mains feeders.
Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k07 © cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Power Distribution 7.5 Power Supply via UPS If uninterruptible power supply (UPS) units are involved in supplying energy to the rack and its components, the connection conditions described in the relevant manuals for the integrated rack components should be complied with in all cases.
8 Optional accessories Various accessories are optionally available with the PRIMECENTER M1 19inch rack, including: – Anti-tilt protection – Rack connectors – Rack installation kits – Cable management systems – Dummy panels – Brush strips – Cable holders – Installation flooring – Multiple socket outlets – Uninterruptable power supply – Rack console (monitor, keyboard and mouse) – Console switches – Earthquake protection kits (on request) I More information can be found at: – http://partners.ts.fujitsu.
© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.
9 Appendix In this chapter you can find additional information on special tasks: – Door conversion I More information can be found at: 9.1 Door conversion On the following pages you will find the description for door conversion.