Operation Manual
Getting started
Getting started
Gettingstarted
Please observe the safety information in the "Important notes", Page 7 chapter.
Unpacking and checking the delivery
It is recommended not to throw away the original packaging material! It may be
required for reshipment at some later date.
PackagingContentsofdeliveryPackaging,
► Unpack all the individual parts.
► Check the contents of the package for any visible damage caused during transport.
► Check whether the delivery conforms to the details in the delivery no te.
► Should you discover that the delivery does not correspond to the delivery
note, notify your local sales outlet immediately.
Steps for initial s etup
Preparingforfi rstuse, overviewPreparingforu se,
Only a few steps are necessary to put your new device into operation f or the firs t time:
• Select a location for device and set up device
• Connecting external devices
• Check the voltage a t the mains outlet and connect the device to an electrical outlet
• Switch the device on
You will learn more about the individua l steps in the following sections.
External devices
If you have received other external devices in addition to your own device ( e.g.
a printer), do not co nnect these until after the initial installation. The following
sections describe how to connect these external devices.
Drives and b oard s
If you have received drives or boards with your device, please do not install
them until after first-time setup. How to install drives and bo ards is described
in the "
System expansions", Page 31 chapter.
12 Fujitsu Technology Solutions