Operating instructions
㪈㪉㪊㪚
Cable tie with clip
(10) Secure the EMI core to the signal transmission cable by using the cable
tie (small).
EMI core
(8) Put the cable tie with clip into the holes on the spacer.
(9) Fix the signal transmission cable with the cable tie (with clip).
Then cut off the redundant end of the cable tie (with clip).
1 : DRM 1
2 : DRM 2
3 : DRM 3
C : COMMON
20
15
( mm )
㪈㪉㪊㪚
(7) Connect the signal transmission cable (fi eld-supplied)
to the demand control signal terminal block.
NOTE: Confi rm that each wires of the signal
transmission cable are fi rmly connected to
corresponding terminal of the terminal block to
the demand control signal terminal block.
(6) Pass the signal transmission cable as shown in the fi gure.
(11) Attach the Insulation to the EMI core.
(4) Connect the demand control option PCB and CND02 on the control board by
using the connector cable (small core).
(5) Fix the EMI core of the connector cable to the cable shown as [A] with the
cable tie (large).
CND02 (RED)
RED
Cable-tie (small)
Insulation
[A]
Cable tie (large)
0 - 10
( mm )
Signal transmission cable
9380829034-02_OM_En.indd 39380829034-02_OM_En.indd 3 2015/11/12 14:33:152015/11/12 14:33:15