AGU15RLF Installation Manual
En-8
[Operation method]
● For the operation method, refer to the operating manual.
● The outdoor unit may not operate, depending on the room temperature. In this case,
keep on pressing the MANUAL AUTO button of the indoor unit for more than 10
seconds. The Operation lamp and Timer lamp will begin to fl ash simultaneously during
cooling test run. Then, heating test run will begin in about three minutes when HEAT
is selected by the remote controller operation. (Please follow the operating manual for
remote controller operation.)
● To end test operation, press the remote controller START/STOP button.
(When the air conditioner is running by pressing the TEST RUN button, the
OPERATION Lamp and TIMER Lamp will simultaneously fl ash slowly.)
[Using the wired remote controller] (Option)
● For the operation method, refer to the operating
manual.
(1) Stop the air conditioner operation.
(2) Press the MODE button and the FAN button
simultaneously for 2 seconds or more to start the
test run.
(3) Press the START/STOP button to stop the test
run.
Test run display
10. REMOTE CONTROLLER INSTALLATION
CAUTION
Check that the indoor unit correctly receives the signal from the remote controller, then
install the remote controller holder.
Select the remote controller holder selection site by paying careful attention to the
following:
Avoid places in direct sunlight.
Select a place that will not be affected by the heat from a stove, etc.
10.1. Remote controller holder installation
• Install the remote controller a maximum distance of 19 ft. (6 m) from the remote
control receiver. However, when installing the remote controller, check that it operates
correctly.
• Install the remote controller holder to a wall, pillar, etc. with the tapping screw.
Remote controller
holder fi xing
Remote controller
mounting
Remote controller
holder
Tapping
screw
(small)
(1) Set
Remote
controller
(2) Down
11. OPTIONAL KIT INSTALLATION
This air conditioner can be connected with the following optional kits. Refer to each
installation manual for the method of installing optional parts.
• Wired remote controller
• Simple remote controller
• External connect kit
11.1. Before installing the optional remote controller
• When you use optional remote controller, some functions may not be used.
• Please use the recommended optional remote controller.
CAUTION
Before installing, be sure to disconnect all power supply.
Don’t touch the heat exchanger.
During installing or removing operation, be sure not to have wire caught by parts or
draw it hard. Or it may result troubles to the air-conditioner.
Avoid place in direct sunlight.
Select place that will not be affected by the heat from a stove, etc.
Before setting up the optional kit, please confi rm whether air-conditioner can receive
the signal.
Do not connect the optional remote controller to the terminal for power supply.
When connecting the optional remote controller with the indoor unit, please use the
connecting cable packaged up with the optional remote controller.
Recommended cable length of optional remote controller is 33 ft. (10 m). Make sure to
do insulate of connecting part when extended the cable.
11.2. Remote controller cable modifi cation
(1) Use a tool to cut off the terminal on the end of the remote controller cable, and then
remove the insulation from the cut end of the cable.
(2) Connect the remote controller cable and connecting cable. (Supplied with wired remote
controller)
Important:
Be sure to solder wires to connect. Be sure to insulate the connection between
the wires.
Connecting cable
White
Red
White
Red
Black
Black
Insulated
connection
Remote
controller cable
Remote
controller cable
13/16 in.
(20 mm)
11.3. External input / output Wire modifi cation
(1) Remove insulation from wire attached to wire
kit connector. Remove insulation from locally
purchased cable. Use crimp type insulated butt
connector to join fi eld cable and wire kit wire.
(2) Connect the wire and locally purchased wire.
(Supplied with external connect kit)
Important:
Be sure to solder wires to connect. Be sure to
insulate the connection between the wires.
Option parts
External input/
output wire
Cable
(Locally
purchased)
Insulated
connection
11.4. Side panel L and control cover removal
(1) Refer to “6.3. Side panel L, R removal and installation” to remove the side panel L.
(2) Remove the control cover.
(3) Remove the control inner cover.
PCB
Control
inner cover
Control cover
9378533066_IM.indb 89378533066_IM.indb 8 8/20/2014 10:32:09 AM8/20/2014 10:32:09 AM