STATUS PWR1 1 PWR2 2 ID 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 RESET S3910-24TS CONSOLE Green=1000M Yellow=10/100M 1 2 On=Link 3 25 Flashing=ACT 4 5 6 7 8 9 10 11 12 13 14 15 STATUS 16 17 18 19 20 21 22 23 26 SFP+ 27 28 24 RESET S3910-24TF CONSOLE Green=1000M STATUS PWR1 PWR2 1 ID 2 3 4 5 6 Yellow=10/100M 7 8 On=Link 9 10 11 Flashing=ACT 12 25 13 14 15 16 17 18 19 20 21 22 23 24 RESET CONSOLE
Introduction Thank you for choosing S3910 Series Stackable Managed Switches. This guide is designed to familiarize you with the layout of the switch and describes how to deploy the switch in your network.
S3910-24TS/S3910-48TS Power Cord x2 Grounding Cable x1 Mounting Bracket x2 M4 Screw x8 Rubber Pad x4 NOTE: S3910 series switches have dust plugs delivered with them. Keep the dust plugs properly and use them to protect idle optical ports.
S3910-24TS 1 STATUS PWR1 PWR2 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 S3910-24TS 24 ID SFP+ 25 26 27 28 RESET CONSOLE Green=1000M Yellow=10/100M Flashing=ACT On=Link CONSOLE RJ45 SFP+ S3910-48TS SFP+ 1 STATUS PWR1 PWR2 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 ID RESET CONSOLE S3910-48TS Green=10
Back Panels S3910-24TF Cable Clamps Holes Grounding Point Power Supply S3910-24TS/S3910-48TS PWR2 PWR1 Dual Power Supplies Grounding Point Front Panel LEDs S3910-24TF STATUS SFP RJ45 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 S3910-24TF 24 SFP 25 26 27 28 STATUS RESET CONSOLE LEDs Green=1000M Yellow=10/100M On=Link Flashing=ACT Status Description Off Switch is not receiving power. Blinking Green System is being initialized.
LEDs RJ45 SFP Status Description Off The port is not connected. Solid Green The port is connected at 1000 Mbps. Solid Yellow The port is connected at 10/100 Mbps. Blinking Green The port is receiving or transmitting traffic at 1000 Mbps. Blinking Yellow The port is receiving or transmitting traffic at 10/100 Mbps. Off The port is not connected. Solid Green The port is connected. Blinking Green The port is receiving or transmitting traffic.
LEDs STATUS Status Description Off Switch is not receiving power. Blinking Green System is being initialized. Solid Green Switch is operational. Solid Yellow Moderate temperature warning: Check the working environment of the switch immediately. 1. Severe temperature warning: Solid Red The temperature severely exceeds the temperature limit, so the system is going to restart. 2. The switch is faulty. PWR1/PWR2 Off No power supply module is connected.
Installation Requirements Before you begin the installation, make sure that you have the followings: Phillips screwdriver. Standard-sized, 19" wide rack with a minimum of 1U height available. Category 5e or higher RJ-45 Ethernet cables, fiber optical cables and console cable for connecting network devices. Site Environment: Do not operate it in an area that exceeds an ambient temperature of 50°C. The installation site must be well ventilated. Ensure that there is adequate airflow around the switch.
Mounting the Switch Desk Mounting 1. Attach four rubber pads to the bottom. 2. Place the chassis on a desk. Rack Mounting 37 38 39 40 41 42 43 44 45 46 47 48 49 SFP+ 50 51 52 S3910-48TS 1. Secure the mounting brackets to the two sides of the switch with the supplied M4 screws.
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 SFP+ 50 51 52 S3910-48T S 2. Attach the switch to the rack using four M6 screws and cage nuts. Wall Mounting 36 37 38 39 40 41 42 43 44 45 46 47 48 49 SFP+ 50 51 52 S3910-4 S39 10-48TS 8TS 1. Attach the mounting brackets to the switch with the supplied M4 screws.
S3910- 48TS 2. Use the expansion screws to securely attach the mounting brackets on the wall. NOTE: Suitable for mounting on concrete or other non-combustible surface only.
Installing the Power Supply Module S3910-48TS/S3910-24TS PWR1 PWR2 1. Take a new power module out of the package. 2. Take the plane printed with power information as the top panel of the power module. Hold the handle of the power module with one hand, and hold the end of the power module with the other hand. Insert it into the chassis along the guide rail steadily and slowly until a click is heard, and make sure that it is in good contact with the power slot. NOTE: 1.
Grounding the Switch 1. Connect one end of the grounding cable to a proper earth ground, such as the rack in which the switch is mounted. 2. Secure the grounding lug to the grounding point on the switch back panel with the washers and screws. Connecting the Power G reen=10 G /1G PWR1 Stat us 1 PW R1 P WR 2 ID 2 Yellow=10/1 00M 3 4 5 6 On=L ink 7 Flashing=ACT 8 9 10 11 12 13 14 PWR2 15 16 17 18 19 20 21 22 23 24 Reset Gre en=10G/ 1G 2 12 14 24 1.
Connecting the RJ45 Ports 1 2 3 4 5 6 7 8 9 10 11 12 13 S3900-24 T4S 14 15 16 17 18 19 20 1. Connect an Ethernet cable to the RJ45 port of a computer, printer, network storage, or other network devices. 2. Connect the other end of the Ethernet cable to the RJ45 port of the switch.
Connecting the Console Port STATUS PWR1 1 PWR2 ID 2 3 4 5 6 7 8 9 10 11 12 RESET CONSOLE Green=1000 M Yellow=10/1 00M On=L ink Flashing=A CT 1. Insert the RJ45 connector into the RJ45 console port on the front of the switch. 2. Connect the DB9 female connector of the console cable to the serial port on the computer.
Stacking the Switches The S3910 series switches support stacking up to 4 units. Switches in the series can be physically stacked using optical fiber cables connected to SFP/SFP+ transceivers or 1/10G Direct Attach Cables (DAC).
Configuring the Switch Configuring the Switch Using the Web-based Interface Step 1: Connect the computer to the business port of the switch using the network cable. Step 2: Set the IP address of the computer to 192.168.1.x. (“x” is any number from 2 to 254.) x I nter n e t Pro to col Ve rs i o n 4 ( TC P /I P v 4) Pro p er t i e s General Yo u c a n g e t I P s e t t i n g s a s s i g n e d a u t o m a t i c a l l y i f y o u r n e t w o r k s u p p o r t s t h i s c a p a b i l i t y.
Configuring the Switch Using the Console Port Step 1: Connect a computer to the switch's console port using the console cable. Step 2: Start the terminal simulation software such as HyperTerminal on the computer. Step 3: Set the parameters of the HyperTerminal: 9600 bits per second, 8 data bits, no parity, 1 stop bit and no flow control. x Quick Connect Protocol: Serial The port may be manually entered or selected from the list.
Troubleshooting 1/10G Port is not Working In the case of compatible cables and transceivers, the port cannot be up, please try to modify the port mode to adapt or force the port speed to 1/10G. Connecting the Switch Remotely Unsuccessfully 1. Test network connectivity through ping. 2. If the network is reachable, try restarting the switch. 3. Check if the corresponding service is enabled. The Port is not Working, the LED Indicator is Off 1. Ensure the switch ports are in the no shutdown state. 2.
Product Warranty FS ensures our customers that any damage or faulty items due to our workmanship, we will offer a free return within 30 Days from the day you receive your goods. This excludes any custom made items or tailored solutions. Warranty: S3910 Series Switches enjoy 5 years limited warranty against defect in materials 5 or workmanship. For more details about warranty, please check at https://www.fs.com/policies/warranty.