Product Manual

CT SERIES CAP 410
WIRING PROCEDURES
FOR
555VT6-A2 & 555VT8-A21 (HI SPEED)
FIELD INSTALLATION PRESSURE SWITCH
WITH OUT MAGNETIC STARTER
PAGE 32
MOTOR
CONNECTION
SINGLE PHASE
POWER SUPPLY
L1
SINGLE PHASE
POWER SUPPLY
L2
MOTOR
CONNECTION
TURN OFF POWER BEFORE SERVICING!!!
THE ABOVE PICTURE DEPICTS POWER SUPPLY WIRE CONNECTIONS TO
PRESSURE SWITCH.
1. FOR FIELD INSTALLATION CONNECT 8GA WIRES FROM POWER
SUPPLY L1 AND L2 TO PRESSURE SWITCH AS DEPICTED ABOVE.
MOTOR CONNECTIONS FROM MOTOR TO PRESSURE SWITCH ARE
FACTORY INSTALLED.