Product Manual

CT SERIES CAP 410
WIRING PROCEDURE
FOR
3 PHASE FIELD MOUNTED MOTOR STARTER
CONNECT INCOMING
POWER WIRES TO
STARTER TERMINALS
L1, L2, L3
CONNECT ONE WIRE
FROM PRESSURE SWITCH
TO STARTER TERMINAL
L1.
CONNECT SECOND
WIRE FROM PRESSURE
SWITCH TO STARTER
COIL TERMINAL A2.
CONNNECT MOTOR
LEADS TO T1, T2, T3.
THERMAL
OVERLOADS (3)
TURN OFF POWER BEFORE SERVICING!!!
1. CONNECT MOTOR LEADS AS PER DIAGRAM ON MOTOR NAMEPLATE
TO STARTER TERMINALS T1, T2 & T3 CONNECT ONE WIRE FROM
PRESSURE SWITCH TO STARTER TERMINAL L1 (USE 18 GAUGE
WIRE).
2. CONNECT 2
ND
WIRE FROM PRESSURE SWITCH TO STARTER COIL
TERMINAL A2 (USE 18 GAUGE WIRE). A2 IS OPEN SPADE CLIP
BEHIND L3.
3. CONNECT INCOMING POWER LINES TO STARTER TERMINALS
L1, L2 & L3.
4. COMPRESSOR FLYWHEEL ROTATION SHOULD BE
COUNTERCLOCKWISE WHEN FACING FLYWHEEL.
5. IF COMPRESSOR FLYWHEEL ROTATION IS REVERSED,
INTERCHANGE INCOMING POWER WIRES TO STARTER TERMINALS
L1 & L2.
PAGE 28