Product Manual
CA / CT SERIES
  CAP600 
Page 
13
 of 
30
   REV B June 2012
Post Installation Checklist 
WARNING! 
Failure to perform the post installation checklist may result in mechanical 
failure, property damage, serious injury or even death. 
Steps 1 through 9 should be performed prior to connecting the unit to a power source. If any 
condition on the checklist is not satisfied, make the necessary adjustments or corrections 
before starting the compressor. 
1.  Remove  all  installation  tools  from  the  compressor  and  check  for  installation  debris. 
Abrasive dust can seriously damage the air intake and belt assemblies. 
2.  All FS Curtis compressors are shipped from the factory filled with the required amount of 
Curtis Lube Plus Compressor Lubricant specially formulated for Curtis Compressors. The 
oil  level should register in  the  center  of  the  oil  sight  glass  or  between  the  high  and  low 
marks  on  the  dipstick.  For  additional  lubricant  contact  your  authorized  Curtis  distributor. 
Failure to use authorized lubricant will void the manufacturer’s warranty. 
3.  Check inlet-piping installation. 
4.  Check all pressure connections for tightness. 
5.  Make sure all pressure relief valves in the air distribution are correctly installed. 
6.  Make sure all guards are in place and securely mounted. 
7.  Open all manual shutoff valves at and beyond the compressor and tank discharges. 
8.  Check and tighten all connections (mechanical and electrical) as they may have loosened 
during shipment. 
9.  After all the above conditions have been satisfied, the unit can be connected to the proper 
power source. 










