Product Manual

CAP820
REV B
MARCH, 2017
2
Mounting DA Series Base Assembly
1. After determining proper location for DA Series as instructed in the “basic
mounting guidelines” section.
2. Mount base assembly at chosen location prior to installing desiccant cartridges.
Make sure there will be a minimum two (2.00) inch clearance above desiccant
cartridges for future service.
Connecting Air Lines
1. Connect high pressure line ( 175 psig max ) to DA Series inlet port (Ref. Fig.1)
2. Connect DA Series outlet port to system air line ( Ref. Fig. 1 )
NOTE: Use appropriate thread sealant on air line fittings top prevent air leaks.
Installing desiccant cartridges & Mufflers
1. After Base assembly is mounted, install both desiccant cartridges to base
assembly as follows.
a) Install O-ring, into groove, of each center thread adaptor in base assembly.
b) Lubricate both O-rings and threads.
c) Lubricate contact surface of flat gasket located in cartridge plate.
d) Start cartridge onto thread adaptor, being careful not to cross thread. Turning
cartridge clockwise until flat gasket contacts casting surface. After gasket contact
turn cartridge only ½ additional turn.
NOTE: DO not over-tighten cartridge or future removal will be extremely
difficult.
2. Install muffler into each exhaust port of the DA Series.
Micro Logic Timer (MLT) electrical connection
1. Plug-in MLT power cord to 110-120 Volt AC grounded receptacle.
NOTE: The MLT device is polarity sensitive. MLT will not operate if power (+)
and neutral (-) leads are switched.