Installation Manual

Table Of Contents
6
Prepare for installation cont...
REV_A02
Looking from the front of the Drawer System, loosely secure a D-ring (Item 4) supplied with SSDR010 to
the top of each first support pillar using a M6 x 20 Hex Bolt, M6 Spring Nut and M6 x 19 Flat Washer
(Items 5, 6 & 7) supplied with SSDR10 as shown below.
()
G
(
H
)
Working inside the loadbay, just below the wheel arches towards the rear of the vehicle, measure and
mark the load bay either side as indicated below. Drill a 6.5mm hole on each of your markings.
Place, Mark & Drill
6.5mm Hole
760 mm
130 mm
Outer Rib
Outer Rib
Edge of Load Bay