Installation Manual

3
FIT YOUR side RAILS
Slide four M8 Nyloc Nuts (Item 3) dome side
down into the U-channel that runs down each
side of the Rack through the gap in the corner
of the Rack as shown. Position the nuts either
side as shown.
() A
REV_A01
Place one End Piece and the Joiner Pieces (Items 2, 5) onto either side of the Rack, making sure that the
"Feet" of the End and Joiner Pieces sit inside the U-channel as shown. Line up the mounting holes in the
End and Joiner Pieces with the Nyloc Nuts inserted in Step 2A and loosely secure them to the Rack using
the M8 x 25 Button Head Bolts (Item 1) supplied.
() b