Installation Manual

3
FIT YOUR side RAILS
Slide three M8 Nyloc Nuts (Item 3) dome side down into the U-channel that runs down each side of the
Rack through the gap in the corner of the Rack as shown. Position the three nuts so that you have one nut
in the middle and one nut at either end of the Rack.
() A
REV_A01
Place one End Piece and the Joiner Pieces (Items 2, 5) onto either side of the Rack, making sure that the
"Feet" of the End and Joiner Pieces sit inside the U-channel as shown. Line up the mounting holes in the
End and Joiner Pieces with the Nyloc Nuts inserted in Step 2A and loosely secure them to the Rack using
the M8 x 25 Button Head Bolts (Item 1) supplied.
() b
Fit the Pipes (Item 4) between the End Pieces and Joiners. Loosely fit and secure the remaining End Pieces.
Center the Side Rail assemblies left to right and tighten all bolts.
Congratulations, you have completed your installation. Take a Step back and admire your work. Good Job!
() C