Installation Manual

© COPYRIGHT 2016 FRONT RUNNER VEHICLE OUTFITTERS
3
FAMP001_REV_A01_MV
2.1
2.2
2.3
2.4
2.5
Clean the area around all of the
mounting points on the vehicle's roof
using a rag and methylated spirits or
denatured alcohol.
Place some Silicone over each hole.
Place the three different sized spacers
(Items 4, 5 & 8) into each corresponding
"mounting recess" as shown.
Place silicon onto the bolting plates
Items 3, 6 and 9.
Fit Front and Rear Foot Rail Item 1 and 2
loosely with Items 11, 12, 13 and the
corresponding bolting plate.
Large Half Moon
Inside of vehicle
Front of vehicle
Small Half Moon
To achieve this installation you will need to drop the interior roof lining and remove the factory roof rails.
Tools needed are not listed.
FIT AND SECURE
2
10mm