Installation Manual

5
REV_A02
3
Before fitting the Wind Deflector, and
with the Rack in the upside down
position, (Check with product sticker. It
should be upside down), slide a M8 x 20
Hex Bolt (Item 6) into each end of the
First Slat using the machined slot as
shown.
FIT THE RACK
()
A
Note: If your Slimline II Tray is not already assembled, assemble it as per the Slimline II Tray Universal
Assembly Instruction (Document RRSTUNI). Read Step 3A before fitting the Wind Deflector
()
B
With your rack still upside down from Step 3A, slide a M8 x 20 Hex Bolt (Item 6) into each end of Slats 2,
5, 6, 10, 11.
Grab your Friend and with one of you on each side of the Rack, flip the Rack end over end (Prevents the
Hex Bolts from falling out the machines slots) so that the M8 x 20 Hex Bolts are facing down. Approach
the vehicle from the rear, with the Wind Deflector facing forward. Lift the Rack up and over the Roof
positioning it above the Foot Rail. Bring the Rack down slowly, lining up the Bolts in the Rack with the
holes in the top of the Foot Rail. Hand tighten the Rack to the Foot Rail using the M8 Washers and M8
Nyloc Nuts (Items 8 &9) supplied.
Center the rack - left to right (check using a tape measure). Fasten all the Nyloc Nuts securing the Rack to
the Foot Rail. Cover the M8 Nyloc Nuts with the M8 Nut Caps (Item 10) supplied.
Congratulations, you have completed your instillation. Take a step back and admire your work. Good Job!