Installation Manual
1
Universal LOAD BED
TRAY & Load BArs
READ ME FIRST:
Thank you for purchasing a Front Runner Slimline II Load Bed Rack or Load Bar Kit.
Your Kit will contain the following items:
1.) A Slimline II Tray or Load Bar Set
2.) Universal Load Bed Tracks
3.) Universal Load Bed Legs
The different sections in this document will help you fit the various items received in your kit.
Section 1: Fitment of Load Bed Tracks to your vehicle.
Section 2: Fitment of Universal Load Bay Legs & Slimline II Tray.
Section 3: Fitment of Universal Load Bay Legs & Load Bars.
INSTALL LOAD BED TRACKS
()
A
Here is what you are looking at for TBRU002. Please note that only one side's components are shown
below. Familiarize yourself with the parts and then step away from the work area and read through these
instructions from beginning to end. Take a moment as a little prep now may save you a lot of time later.
You will need:
4 mm Hex key
10 mm Wrench
4 & 7 mm Drill bit
Drill machine
INSTALL TIME: 2.5 Hours
Marking pen
Measuring tape
Small Phillips Screwdriver
Friend
Item # Quantity Description
1 4 M3 x 6 SELF TAPPING SCREW
2 12 M6 x 25 COUNTERSUNK BOLT
3 4 END CAP
4 2 LOAD BED TRACK
5 2 RUBBER TRACK LINER
6 6 CLAMP PLATE
7 12 M6 FLAT WASHER
8 12 M6 NYLOC NUT
TRBU002 / KRLBUNI2_REV
_
A00
TRBU002 / KRLBUNI2