Installation Manual

© COPYRIGHT 2018 FRONT RUNNER VEHICLE OUTFITTERS
3
FAFF001_REV_A00
FIT AND SECURE
2
2.1
2.2
2.3
Measure 200mm forward from the centre of
the rivet in the ditch moulding shown in Step
2.1 and make a mark in the roof ditch. This
will be the rear hole for the Foot Rail.
Position the Foot Rail in the ditch. Align the
rear mount hole in the Foot Rail with the rear
mark you made earlier in Step 2.1 and mark
the remaining five holes.
Remove the Foot Rail from the vehicle.
Drill a 5mm Pilot hole in the centre of the
markings. Open the holes using a 12mm Drill.
Insert the M6 Button Head Bolt (Item 12)into
the one side of the Installer Wrench (Item 13).
Loosely fit a Jack Nut (Item 3) to the Button
Head Bolt as shown.
Using the Installer Wrench and a M6 x 30
Button Head Bolt, insert the M6 Jack Nuts
into all 12 holes.
Place the assembly into a hole drilled in
Step 2.2. Using a Battery Powered Screw
Driver and a 4mm Allen Key Bit, set the
Jack Nut into the hole while holding onto the
handle of the Installer Wrench.
3
12
13
Rivet in trim moulding
Make sure that the Jack Nut has pulled
up all the way to the inside skin of the
roof panel.
5mm
12mm