Installation Manual

LASS028_REV_A05
3
© 2021 FRONT RUNNER VEHICLE OUTFITTERS
1
1
1
3
5
7
FIT AND SECURE
2
Looking from the side of the vehicle, position
the Leg Mounts (Item 3) to center the
Slimline II Rack or place Load Bars where
desired over the load bed.
10MM
2.1
2.2
2.3
=
=
Loosely fit a Leg Mount (Item 3) to each of
T-Bolts using M8 x 19 x 2 Flat
Washers and M8 Nyloc Nuts (Items 5 & 7).
Slide four M8 x 20 T-Bolts (Item 1) into each
side profile.
(Four are needed per side to fit Load Bars or
a Rack).
10MM
10MM
Depending on your track you might need
the 13mm T-Bolt (Item 10).