User Manual

31
(1)
(2)
(3)
Settings
Settings for the Fronius String Control 250/25 are made in the “Fronius
Solar.access“ software.
General
Initial Steps - Install Fronius Solar.access software on a PC
- Administration / Create PV System
- PV Systems / [System Name] / Settings / String Control
(1) Select the number (address) of the Fronius String Control 250/25 to
be set
(2) Strings per Measuring Channel
(3) Limit Values:
- Max. Energy Deviation in %
- Threshold Value in Ah per String
Possible Set-
tings for the
Fronius String
Control 250/25