User Manual

11
Knocking out Cable Input Openings and Moun-
Required cable input openings have to be knocked out of the Fronius
String Control 250/25 housing with a proper knock out tool.
Take care that safety notes and rating plates located on the housing are
not damaged when knocking out cable input openings.
General
DC OUT
GROUNDING OUT
DC OUT
DC OUT
GROUNDING OUT
GROUNDING OUT
Cable Input
Areas
Generally cables can be lead into the Fronius String Control 250/25 from
below or sidwise.
The following figure shows all possible cable input areas and the approp-
riate measurements. On grey marked areas cable input openings can be
knocked out on the Fronius String Control 250/25.
= Cable input areas
ting Conduits on the Fonius String Control
250/25