Installation & Operation Manual (2019, 2020, 2022)

Table Of Contents
14
TABLE 2
MODEL
HEATER kW
Power Cord Kit
Voltage
Amperage
Receptacle
PVH09K
2.5(optional)
STD
230/208
15
NEMA 6-15r
3.5(default)
STD
230/208
20
NEMA 6-20r
PVH12K
1.5(optional)
STD
230/208
15
NEMA 6-15r
3.5(default)
STD
230/208
20
NEMA 6-20r
5.0(optional)
STD
230/208
30
NEMA 6-30r
PVH09R
2.5(optional)
STD
265/277
15
NEMA 7-15r
3.5(default)
STD
265/277
20
NEMA 7-20r
PVH12R
1.5(optional)
STD
265/277
15
NEMA 7-15r
3.5(default)
STD
265/277
20
NEMA 7-20r
5.0(optional)
STD
265/277
30
NEMA 7-30r
Electrical Wiring for 265 Volt Models
Power Cord Installation
All 265V PTAC/PTHP units come with a factory installed non-LCDI
power cord for use in a subbase.If the unit is to be hard-wired refer to
the instructions below.
NOTE: It is recommended that the PXSB subbase assembly, the
PXCJA conduit kit(or equivalent) be installed on all
hardwire units.If installing a flush-floor mounted unit,make
sure the chassis can be removed from the sleeve for
service and maintenance.
Toinstall the line voltage power leads and conduit to
chassis, follow the instructions below . PXCJA
ConduitKit is required with this setup.
1. Follow the removal process of the chassis’s junction box .
2. Prepare the 265V(or 230V)power cord for connection to the chassis’
power cord connector by cutting the cord to the appropriate length
(refer to Figure16 and follow Figure15).Power cord harness selection
shown on Table 2 on page 14.
WARNING
Electrical Shock Hazard
Turn off electrical power before service
or installation.
ALL electrical connections and wiring
MUST be installed by a qualified
electrician and conform to the National
Code and all local codes which have
jurisdiction.
Failure to do so can result in property
damage, personal injury and/or death.