Installation Guide
Use steps 1-4 to install your Fresh Air Screen. Use Steps 5-8 to install the Rope and Pull Kit.
If you already have a Fresh Air Screen installed, skip to step 5.
STEP 1
Measure the height of the door jambs and the length of the header. Cut the self-adhesive loop
roll into three strips equal to those measurements.
STEP 2
Apply the Self-Adhesive Loop.
• Select an adhesive loop strip that was measured and cut for the door jambs in step 1.
Align and press to seal the self-adhesive loop strip on one door jamb about 1” in front
(street side) of the door stop/weather strip. Repeat this step for the other side.
• Add the last adhesive loop strip to the header, which should line up with the loop strips
on both door jambs to create a smooth surface edge.
Recommendation: Apply roofing nails (optional) to the adhesive loop strips for a more
permanent hold. DO NOT PUNCTURE THE SCREEN. Replacement adhesive loop strips are
available for purchase.
STEP 3
Start at an upper corner to attach the screen to the adhesive loop. Align the hook strip (sewn to
the screen) to the adhesive loop strip (attached to the garage in step 2) and press firmly to
connect the strips. Work your way across the header, then down each side of the frame.
STEP 4
Insert a ¾” rod into sewn pouch on bottom of screen to maintain position and shape when
rolled up.
STEP 5
Attach the cleat, using the wood screws, to the door jamb between the garage door and the
screen, about 5’ high on whichever side you will pull from.
STEP 6
Install eye screws. All eye screws should go into the header on the inside of the screen
approximately 1” away.
Eye Screw 1&2- Place one on each side, 6’’ from the center zipper
Eye Screw 7&8 (Large Kit only) Place one on each side of the screen, 1/3 of the length away
from each end of the screen.
Eye Screw 3&4- Place one on each side, 12” in from the outside zipper
Eye Screw 5&6- Place one on each side, 6” from the outside zipper
STEP 7
Attach brackets to the header (street side) across from eye screws 1, 2, 3, and 4 (also across
from eye screws 7 and 8 for large rope and pull kits)
STEP 8
Insert the cords accordingly:



