User Guide

16
Install the Concrete Mounting Template
Dig an opening to accommodate the wiring conduit and the concrete mounting pad.
Step 1 Excavate the site making room for the concrete foundation pad that meets local codes and
requirements.
Step 2 Construct a concrete form for the concrete foundation pad.
Important: Make sure that the conduit is positioned within 1/16” of the opening in the mounting
template and is plumb. The conduit should extend 8.0” above the concrete surface.
Step 3 Position the concrete mounting template so that the word “FRONT” is facing up and is placed where
the front of the charging station will be located.
Step 4 Slide the concrete mounting template over the conduit. For proper installation of the Boost Charger,
the top surface of the template must be positioned 2.3” below the top surface of the concrete when
poured. Use the bottom of the plastic caps to align with the surface of the concrete. Avoid flexing
the conduit while placing the concrete mounting template. Ensure that the conduit is plumb and the
concrete mounting template is level.
Important: Secure the concrete mounting template and conduit prior to pouring the concrete. While
pouring the concrete and during the cure, it is important to prevent them from rising or floating out
of position.
Step 5 Pour the concrete into the form ensuring that it is level and does not contain any rough portions or
irregularities.
2 PREPARING THE MOUNTING PAD