User Guide

13
2 PREPARING THE MOUNTING PAD
The AC conduit enters the opening from the front of the Boost Charger. Follow the steps below to assemble
the mounting template:
Step 1 Insert one bolt into one of the bolt holes of the top plate of the template.
Step 2 Be sure to thread the additional bolts and install the washers before passing the bolt through the
bottom plate of the template.
Step 3 Save the locking nuts (x8) and washers (x8) for installation of the Boost Charger once the concrete
is cured.
Step 4 Completely install the plastic cap down on the bolt. Then, holding the bottom nut and washer flush
against the top surface of the bottom plate, thread the bolt onto the nut until the distance between
the bottom of the plastic cap and surface of the top place is 2.3”.
Step 5 Repeat Steps 1 through 3 for the remaining seven bolts.
Step 6 Secure a second washer and nut onto the bottom of each bolt until flush with the bottom surface of
the bottom plate. Tighten each nut to 50 ft-lb.
Press the plastic cap fully
down onto the bolt
Distance should be 2.3”
Hold the bottom washer
and nut against the top
surface of the bottom plate
while adjusting the bolt
Concrete surface
3.8”