User's Manual

Table Of Contents
2. Installation and Setup
Page 29 of 267 LUM0073AA Rev Feb-2017
This document is the property of FreeWave Technologies, Inc. and contains proprietary information owned by
FreeWave. This document cannot be reproduced in whole or in part by any means without written permission from
FreeWave Technologies, Inc.
3. Using the masonry wedge anchor bolts in the Mounting Kit Package, and with the
threaded ends facing outward, hammer the bolts into the openings.
Caution: Be careful to keep the threaded ends of the bolts visible outside the wall.
Figure 24: Hammer the bolts into the drilled openings
4. Verify all antennas are attached to their correct ports and the Ethernet cable is connected
between the PoE+ Injector and the E1 Port (PoE Input) on the WP201.
5. Using the enclosed Packaged Ground Screw, attach the loop end of one of the supplied
Green / Yellow #10AWG Ground Cable to the ground point on the Back of the WP201-
100 (on page 15).
DRAFT