Installation & Assembly

1
2
3
Parts List:
Step 1:
Mount the Aluminum Petal with pre attached Guards to the Steel Post with the provided 1/4"-20 Button Head Screws and
Security Driver.
Step 2:
When mounting the Petal, make sure that is is mounted with the smallest petal sections at the bottom. Be sure to keep
the side of the Flower Petal with the solid Guard to the outside.
Step 3:
Drive the screws through the Petal into the Post slowly to prevent stripping. Tighten them down until the head of the screw
just starts to sink into the plastic Guard.
ITEM NO.
PART DESCRIPTION
QTY.
1
Steel Post
1
2
Aluminum Petal Plate W/ Guards
1
3
1/4"-20 Button Head Screw, 1.25"lg. SS,T27 tamp
4
4
Security Driver
1
5
3/8"-16 Wedge Expansion Anchor, SS
3
6
35/64" Hex Nut Cap
3
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
FREENOTES HARMONY PARK. ANY
REPRODUCTION IN PART OR AS A
WHOLE WITHOUT THE WRITTEN
PERMISSION OF FREENOTES HARMONY
PARK IS PROHIBITED.
FREENOTES HARMONY PARK
194 BODO DRIVE, UNIT F
DURANGO CO 81303
TEL: (970) 375-7825
FAX: (970) 247-0856
WWW.FREENOTESHARMONYPARK.COM
SHEET 2 OF 3
TITLE:
SCALE: 1:8
REVISION: A
DATE: 10/4/2017
DWG. NO.
Parts List and Petal to Post Installation
FWR-INSTALL