Installation & Assembly
Table Of Contents
DETAIL A
SCALE 1 : 4
1
2
3
Mounting Plate
Parts List:
Step 1:
When mounting the Leaves and Hardware to the Tree Trunk start at the lowest mounting plate on the Tree Trunk and working
up going to the next lowest mounting plate location. Each Leave is numbered. Using the following number pattern when installing
from the bottom up:
3, 2, 1, 6, 5, 4, 9, 8, 7, 12, 11, 10
Step 2:
A Security Driver is provided for securly fastening down the screws through the leaves into the Trunk mounting plates. Drive
slowly to prevent the threads from stripping. Tighten down until the Leaf is flush with the mounting plate.
Place a small drop of Blue
Loctite to the end of the screw prior to installation to prevent fasteners from backing out.
ITEM NO.
PART NUMBER
DESCRIPTION
QTY.
1
TREE-TNK-FP
Tenor Tree - Steel Trunk (Powder-coated)
1
2
TREE-LEAF-SET-FP
Tenor Tree - Aluminum Leaf Set (Anodized)
1
3
25C50MBTS
1/4"-20 Button Head Screw, .5"lg. SS, T27 tamp
36
4
12263B
T27 x 1" Driver
1
5
209728-12
Loctite Heavy Duty Threadlocker, 0.2oz, Blue 242
1
6
POW 07315
3/8"-16 Wedge Expansion Anchor, 3.75"lg. SS
4
7
9267K43
35/64" Hex Nut Cap
4
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
FREENOTES HARMONY PARK. ANY
REPRODUCTION IN PART OR AS A
WHOLE WITHOUT THE WRITTEN
PERMISSION OF FREENOTES HARMONY
PARK IS PROHIBITED.
FREENOTES HARMONY PARK
194 BODO DRIVE, UNIT F
DURANGO CO 81303
TEL: (970) 375-7825
FAX: (970) 247-0856
WWW.FREENOTESHARMONYPARK.COM
SHEET 2 OF 3
TITLE:
SCALE: 1:12
REVISION: A
DATE: 11/21/2018
DWG. NO.
Parts List and Leaves to Trunk Installation
TREE-INSTALL