Installation Guide
7
Apply glue on inside rim of post tops then attach
to posts (Fig. 22). Repeat these steps until
completed.
Fig. 22
Insert the completed fence panel into the route
holes of the second fence post. Plumb and
level the post and add concrete according to
manufacturers instructions to top of hole (Fig. 21).
Fig. 21
Fig. 19
Fig. 20
For Shadowbox Panels:
a. Insert the middle rail into middle post route
holes of rst post only (Fig. 19).
b. Insert the top rail into the rst top hole post
route then guide over top of boards (Fig. 20)
c. Proceed to Step 8.
8
9