User Manual
Tank Sentinel Reports Page 3 - 29
3
CPM Monthly Report
The Regulatory Report now includes a Monthly CP Status
Report, which is updated on the first day of every month. Up
to 12 months of Monthly CP reports are included in the
Regulatory Report (CPM must be enabled).
This report is available on demand for printing at the tank
gauge printer, or for faxing, or it can be sent via modem to
a site when the Regulatory Report is programmed properly.
A monthly CPM Status Report is shown at right. This report
can be automatically FAX’d to remote locations when the
tank gauge is equipped with an optional Fax-Modem. To do
this see the Comm Ports menu and Reports menu in the
Setup Programming Manual (INCON Part Number 000-
1053).
The TS-CPM programmed settings will appear on the
Setup Report. These are:
•
Enabled = YES or NO
•
Address = 112 (default value)
•
Current (Alarm Limit) = Programmed Value
•
Current OG
(output group) = Programmed OG
NOTE
☞
INCON
INTELLIGENT CONTROLS INC.
P.O. BOX 638
SACO ME 04072
1-800-984-6266
3/12/2002 4:10 PM
REGULATORY REPORT
:
MONTHLY CP
3/1/2002 12:00AM
VOLTAGE 15.0 V
CURRENT 10.0 A
STATUS OK
2/1/2002 12:00AM
VOLTAGE 15.2 V
CURRENT 9.9 A
STATUS OK
INCON
INTELLIGENT CONTROLS INC.
P.O. BOX 638
SACO ME 04072
1-800-984-6266
SYSTEM SETUP REPORT
:
CATHODIC PROTECTION
ENABLED YES
ADDRESS 112
CURRENT 8.0
CURRENT OG NONE