Instructions / Assembly
Table Of Contents
FENCE INSTALLATION GUIDE
Position the first fixing post support (A1). 
Mark all 4 holes with a marker and drill 4 inches 
into the concrete using a masonry drill bit (10mm 
or 3/8”).
Fasten each anchor bolt (A2) to the fixing post 
support by removing the nut and washers from 
the bolt, then threading the bolts through the 
bottom of the fixing post support. Fasten each 
anchor bolt to the support using the nut and 
washers. Once all 4 bolts are secured to the fixing 
post support hammer all in, one strike at a time 
each to keep the support level as it goes into the 
ground.
Repeat this process to secure the second fixing 
post support to the ground.
It is essential to have an 1800 mm (71”) gap on 
center between the two fixing post supports. 
(A) INSTALLATION WITH FIXING POST SUPPORT ON CONCRETE SLAB
Have an Issue or Question? Contact us first at: 
Support@Frameitall.com or (800) 914-9835










