Instructions / Assembly

FENCE INSTALLATION GUIDE
Position the first fixing post support (A1).
Mark all 4 holes with a marker and drill 4 inches into
the concrete using a masonry drill bit (10mm or
3/8”).
Fasten each anchor bolt (A2) to the fixing post
support by removing the nut and washers from the
bolt, then threading the bolts through the bottom of
the fixing post support. Fasten each anchor bolt to
the support using the nut and washers. Once all 4
bolts are secured to the fixing post support hammer
all in, one strike at a time each to keep the support
level as it goes into the ground.
Repeat this process to secure the second fixing post
support to the ground.
It is essential to have an 1800 mm (71”) gap (+/- 5mm
or 0.2 inches) on center between the two fixing post
supports.
(A) INSTALLATION WITH FIXING POST SUPPORT ON CONCRETE SLAB
Have an Issue or Question? Contact us first at:
Support@Frameitall.com or (800) 914-9835