Instructions / Assembly

(B) INSTALLATION IN-GROUND CONCRETE FOOTING
Pour 3” (72mm) of gravel into the
post holes to allow drainage.
Compact the gravel into the hole
and ensure a level surface.
Confirm that the depth of your post
hole are consistent and comply
with local building code. Adjust
depth if needed.
Have an Issue or Question? Contact us first at:
Support@Frameitall.com or (800) 914-9835
FENCE INSTALLATION GUIDE