Operation Manual
Frama Matrix F4 / F6
54
8. FramaOnline2 settings
8.1. Loading credit
The procedure for loading credit has already been described in depth under
point 2.2.
8.2. Inspection
You can carry out so-called inspection loadings with your Frama Matrix frank-
ing system. You use them to transmit the counter readings, to check the postal
rate tables and to balance / compare data with the post office.
The inspection loading must be carried out whenever the franking system re-
quests a connection with the FramaOnline2 data centre, even if you need no
new postage credit. As a rule, this will be at least once a month (according to
current Royal Mail regulations) unless you requested new credit beforehand.
To carry out an inspection loading, press “Inspection” in the FramaOnline2
menu and follow the displayed instructions.
8.3. Activation code
The activation code is required only when loading the first time. The procedure has already been de-
scribed in detail under point 2.1. When your franking system has been activated satisfactorily, the key will
fade out.
8.4. Last Message
On pressing this key, you will see the last report transmitted from the FramaOnline2 data centre. Touch
the display to return.
8.5. Print report
On pressing this key, you will print out the last report transmitted from the FramaOnline2 data centre (see
print information “FramaOnline2”). Put an envelope or something similar in the franking system to print
out the report.
8.6 Uninstall
This calls a function to uninstall your franking system from the FramaOnline2 data centre. This function
can only be used if your FramaOnline2 account has been prepared for uninstallation.