Installation Instructions

Step 5 - Fit, Tighten, & Secure the Turf
Once the turf is laid out and roughly cut to fit,
it is time to begin securing it to the base,
making final fitting trims, and connecting the
different sections.
Fasten one end of the turf with 60D nails,
spaced 3"-4" apart. Stretch turf tight, and
fasten with nails as you move across to the
opposite end. Trim any perimeter edges to fit.
Place a nail every 3"-4" along the perimeters
and every 12"-24" throughout the field.