Product Manual

CO7338.1 8 IN20525 Rev D 3/30/2009
17. Install the “braded” Hydraulic Hose (Item # 74) to the Fitting on the side of the
Mainside Runway and attach the other end to the 90 degree Fitting on the Power
Unit as shown in Figure # 3
.
18. Now raise the complete unit (Lift) and set at one of the bottom lock positions.
Place level on crossbeam.
19. Tighten Lock Ladder Rod Nut located on the top of each posts (Item # 41). This
will raise the corner of the lift to adjust for leveling. Each post has this adjustment.
Adjust the proper columns to level the lift. Place level on each runway and
crossbeam and check for proper levelness.
NOTE: YOU MAY HAVE TO LOOSEN THE NUT UNDER TOP PLATE TO MAKE
ADJUSTMENTS.
20. After leveling is complete, tighten the Nut on the Lock Rod underneath the Top
Cap on each post. This will lock the Lock Ladder in position.
21. Raise lift off all locks until cables are supporting the lift. Adjust the Cable Nylon
Lock Nut (Item # 72) located on the top of each post until lift is level on
crossbeams and runways. This will ensure the lift travels up and down level.
NOTE: YOU MAY NEED TO USE LOCKING PLIERS TO HOLD THE CABLE
FROM TURNING WHEN ADJUSTING THE NYLON NUT. MAKE SURE THAT
THREADS ENGAGE THROUGH NYLON ON EACH NYLON NUT.
22. Reinstall Crossbeam Covers (Items # 24, 25 & 26) Figure # 7 and the bottom
Runway Cover (Item # 97) Figure # 4 onto the underside of the Mainside
Runway.
23. Install front Wheel Stops (Item # 27) and Foot Plate (Item # 23) with provided
hardware as shown in Figure # 7.
24. Install the Drive On Ramps (Item # 20) with Pivot Shafts (Item # 22) as shown if
Figure # 6.
NOTE:
BE SURE TO LUBRICATE ALL CABLE SHEAVES, BEARINGS, AND
SHAFTS WITH A GREASE GUN PRIOR TO OPERATING THE LIFT.