Installation Guide

5
INSPIRE RAILING INSTALLATION
Top of Post
3-13/16”
[97mm]
4-5/16”
[110mm]
Boom of Post
4-1/16”
[103mm]
3-9/16”
[91mm]
*Installed heights include a 3-1/2”[89mm] space between deck surface
andboomedgeofboomrail.
Inspire RailingPostConguraon
32-1/2”[826mm]
36”[914mm]
39-1/2”[1003mm]
Inspire Railing
Panel Height
Inspire Railing Panel
Installed Panel Height* Required Post
BRACKET INSTALLATION
Step 1: Install Brackets
1. Locatedimplesonpost.AsshowninFig.1.Each post has
three faces with dimples for the bracket holes of the top
andboombrackets,fourthfaceisblank.
2. Pre-drill bracketholeswitha3/16”[5mm]drillbit.
3. Aachbracketsintothepre-drilledholesinpostswith
suppliedT-25thread-cungscrews.AsshowninFig.2.
Usetwoscrewsperbracket.Uselowspeedsengondrill.
4. Removeallmetalshavingsfrompostandbracketto
preventcorrosion.
Fig.1
Fig.2