Installation Guide
3
INSPIRE RAILING INSTALLATION
INTRODUCTION
READ INSTRUCTIONS COMPLETELY BEFORE
STARTING INSTALLATION
It is the responsibility of the installer to meet all code and
safety requirements, and to obtain all required building
permits.Thedeckandrailinginstallershoulddetermine
andimplementappropriateinstallaontechniquesforeach
installaonsituaon.FortressBuildingProductsand
its distributors shall not be held liable for improper or unsafe
installaons.
Fortress Posts must always be secured to the deck
framingandshouldneverbeaachedtoonlythedeck
boards.
Note
WhencungInspireRailing,itisveryimportantto
complete the following at cut points:
• Removeallmetalshavingsfromthecutarea.
• Fileanysharpedgeslebycung.Thoroughly
wipeandremoveanylings,grimeordirtfromthe
railing.
• Apply two coats of Fortress zinc based touch-up
painttothecutarea.Iftouchupisatrailends,
allowpainttodrybeforeconnecngbracketto
post.
• Be sure to remove any metal shavings from the
surfaceofdeck,paoorbalconytopreventstains
onthedecksurface.
Torx Safety Tips
• Alwaysusethelowestspeedsengondrill.
• Toreducechanceofbitbreakage,startghteningwithdrill
onlowtorquesengandworkupunlscrewissecured.
Tip: Pre-drill holes with 3/16” [5mm] drill bit.










