Instructions / Assembly

8
FENCING INSTALLATION: EVOLVER
sewerage lines, that may run across them.
You may wish to check that you are not
digging into them.
STEP 2.1
Slide your post over the mount.
STEP 2.2.
Use a screw to fasten your post to your mount.
Installation Guide - 2017 4
Fig.2
Fig.3
SECTION
VIEW
TOP VIEW
Line Post Base
Corner Post Base
Step2:Mount Post (NotEmbedded/ExisngFoundaon)
1. SlidethePostoverthemountedPostBases.
AsshowninFig.1.
2. Be sure to have each fence board slot facing the slot of
theoppositepost.AsshowninFig.2.
3. Usealeveltoconrmthatthepostismountedat
90
o
degreeangle.
4. Pre-drillscrewholesintoPostBase&Postwith
a1/16”[2mm]drillbit.
5. Useadrilltofastenscrews into the post to the mounted
postbase.AsshowninFig.3.
Note:
• Closedwallsidesareaesthecallybestposionforforward
facingposts.
• PostSlideCoverscanbeusedtocoverunusedfenceslots.
Max.Post Base Spacing is 73”[1860mm].
Fence Board Width is 70-1/2”[1791mm].