User Guide

ES210 Hardware Guide: Installation
3
Chapter 2
Installation
2.1 Preparation
Before using or charging an ES210 battery, review the initial
installation and charging information in Section 1.1.
Before proceeding with installation, review the safety
information in Section 2.1.1 below.
WARNING:
To
avoid the risk of
severe electrical shock,
never remove part of the
ES210’s chassis
other
than the battery cover
and serial port cap, as
directed in this guide.
There are no user-ser-
viceable parts inside. Re-
fer all hardware
servicing to Fortress
Technical Support.
2.1.1 Safety Requirements
To prevent damage to the product and ensure your personal
safety, operate the ES210 Secure Wireless Bridge only within
the operating specifications given in Section 4.1.3, and
carefully follow these guidelines:
General: This equipment must be installed by qualified
service personnel according to the applicable installation
codes. Do not locate the Bridge or antennas near power
lines or power circuits.
Transportation: The carton is marked with a Lithium-Ion
label, per Department of Transportation (DOT)
requirements. The unit is shipped with batteries installed in
the device.
Indoor/Outdoor Siting: All interconnected equipment
connected to the indoor/outdoor Bridge must be contained
within the same building, including the interconnected
equipment's associated LAN (local area network)
connections.
In outdoor environments, the Secure Wireless Bridge
should not be mounted outside a home, school, or other
public area where the general population has access to it.
Ambient Temperature: The temperature of the environment
in which the Bridge operates should not drop below the
minimum (
14º F/-10º C) or exceed the maximum (140º F/60º
C
) operating temperatures.