Instructions / Assembly

Pure View Baluster Pre-slotted Rail Assembly
Pure View Pre-slotted Rails
Pure View Pre-Installed Standard Grommet*
*Pure View Standard Grommets come installed in pre-slotted rails.
Pure View Baluster
Pure View
Pre-Installed Grommet*
Pure View
Pre-slotted Rail
Pure View Baluster
• If pre-slotted rails were cut to length, file cut edges and coat with 2 coats of Fortress zinc based touch-up paint.
• Check fit of pre-slotted rail between installed posts.
• Insert ends of Pure View Balusters into the Pure View Pre-slotted rail and Grommet Assemblies.
Pure View Panel Installation with UB-05
Pre-Drilled
Post
Base Cover
Installed
Set Screw
UB-05
Cap
UB-05
Cup
UB-05
Cup
UB-05
Cap
UB-05
Cap
UB-05
Cup
UB-05
Cup
UB-05
Cap
When using UB brackets rails MUST be cut 1/2” shorter that the distance between posts. 1/4” should be cut
from the end of each rail to keep rail panel centered between posts.
• If rails were cut to length, file cut edges and coat with 2 coats of Fortress zinc based touch-up paint.
• Check fit of rail between installed posts.
• If using a Base Cover install it now by sliding over the top of Iron Post.
• Secure UB brackets to posts with provided metal screws. Use two screws per bracket. Use low speed setting on drill.
• Install 3-3/4” I-Support at mid point of bottom rail.
Drop Pure View Panel into installed UB brackets.
• Secure rails with provided set screws at each UB bracket.
• Install UB-04 Caps by sliding the cap over the UB Cup. Cap will snap into place.
3-3/4” I - Support