Installation Guide

Table Of Contents
Pure View Installation Options
Rail Panel
Height
34-3/8”
40-1/8”
Installed Panel
Height*
37-7/8”
43-5/8”
Required
Post
39-1/2”
45-1/2”
Rail Panel Only
13
Pure View Panel and Al Post Configurations
*Heights include a 3-1/2” space between deck surface and bottom edge of bottom rail.
Evolve External Bracket Hole Locations for Pure View Panel Installations
Pre-Drilling with a 3/16” drill bit is required.
Rail Panel
Height
34-3/8”
40-1/8”
A*
3-13/16”
3-13/16”
B
1/2”
1/2”
Pre-Drill Dimensions
C
37-1/16”
42-13/16”
*Dimension A positions bottom edge of rail 3-1/2” above deck surface.
*Dimension A is measured from the bottom surface of post base.
B
B
A
C
Remove all metal shavings from deck, post base cover, post, and
panel before bracket is screwed to post to prevent corrosion.
B
A
D
D
13/16”
13/16”
13
Al Pure View Pre-Slotted Rail
69”
13
Al Post with Post Base Cover
13
Al Pressed Fit Ball Cap
13
Al Pressed Fit Flat
Pyramid Cap
Evolve
External
Cup
Evolve External
Cap
Evolve
External
Cup
Evolve External
Cap
Evolve
External
Cup
Evolve
External
Cup
Evolve
External
Cap
Evolve
External
Cap
13
Al I-Support
2/3