User Manual
Table Of Contents
- Introduction
- Required Tools + Materials
- Material List
- Physical Features
- Download the App
- Specifications
- Resetting the Guardian Hub
- Installing the Guardian
- Wiring the hub
- Powering the Guardian
- eFlex Specific Instructions
- eVault Specific Instructions
- Commissioning
- Firmware
- Troubleshooting Please fill out a support requests at https://support.fortresspower.com
- Alerts
Installing the Guardian
The Guardian monitoring hub should be installed near the battery bank. When building a custom
communication cable, stay within 50’ of the battery units. If the installation is outdoors, you
must install the Guardian inside a plastic junction box. Alternately, the Guardian can be installed
inside the Fortress FlexTower or DuraRack racking system.
The Guardian is din-rail mountable and includes a din rail which can be mounted to an electrical
box or wall.